Commercial building construction

We will go through all the stages of construction with you, from design to protection of structures

Write to us

Specificity of buildings

A whole range of requirements are imposed on commercial buildings, some of them are similar to those that have residential buildings, some are due to the specifics of the activity:

  • maximum thermal insulation;
  • maximum thermal insulation;
  • good sound insulation and vibration protection;
  • resistance to aggressive environments: moisture, temperature extremes, and in certain cases - to the effects of chemicals;
  • the possibility of erecting buildings of solid dimensions, in the case of equipping warehouses - with a significant width of spans and large volumes of internal premises with a minimum number of load-bearing columns;
  • fast construction time;
  • modern, presentable, appearance.

Exterior of buildings

For most commercial buildings, a standard rectangular shape lined with beautiful material is sufficient. However, in some cases, especially when arranging office buildings and entertainment complexes, the owner seeks to give the structure an original appearance. 

Other advantages

In addition to the functional factors that ensure the conduct of commercial activities, other advantages are of no small importance in modern BMZ:

Environmental safety - "clean" materials are used in the production. Thanks to the practically waste-free construction technology, the site is not littered with "mountains" of garbage that requires disposal.

Preparation for construction

Commercial real estate is built for business development, so the process requires careful analysis from the very beginning. You need to objectively assess your capabilities to eliminate negative consequences. For this purpose, an initial assessment of financial capabilities is carried out, taking into account own funds, investments, government support, loans, borrowings and other receipts. It is better if you get the planned finances before starting construction.

Choice of land

  1. restrictions on the orientation of the building on the site and on construction in height;
  2. the presence of utilities in the designated area or nearby: electricity, gas, water supply, sewerage;
  3. whether responsibility for the locality is assigned to municipal services;
  4. ecological cleanliness and development prospects of adjacent territories;
  5. businesses located in the neighborhood.

Engineering and geological surveys

The results of the geological examination of the site are presented by the seller. If there is no such data, then you need to order a topographic survey and engineering-geological surveys from a licensed company (organization). Based on the information received, the type of foundation of the future structure is calculated.

Primary documentation and preliminary budget calculation

Getting permission

Construction scheme

Choosing a construction company

Construction stages

  1. Development and approval of a business plan
  2. Before starting any construction, it is necessary to correlate the income from its ownership and the costs of its construction.
  3. Selecting a site for an object
  4. It's no secret that the key to a successful business is the right choice of location. It is necessary to take into account everything: from infrastructure and transport accessibility to the plans of the relevant ministries for the further development of the territory.
  5. Development of an architectural and engineering design project
  6. The project is developed in accordance with the wishes of the customer, the budget and the requirements of the regulatory and technical base. Development is possible only by organizations of a specialized SRO.
  7. Construction works
  8. Zero cycle activities are being carried out and the building is being erected in accordance with the approved project.
  9. Conducting engineering networks
  10. No building is complete without communications. Plumbing, sewerage, heat supply, ventilation, climatic equipment, fire protection and other systems are carried out in the building.
  11. Delivery of the object to the supervisory authorities
  12. The final stage, completing the construction of the property. The procedure is carried out in accordance with federal and local laws.